Before a demolition or renovation in Birmingham, someone has to establish whether asbestos is present. Federal law puts that duty on the “owner or operator,” which includes the contractor running the job. We do the inspection and the sampling — and nothing after it.
Birmingham and all of Jefferson County. Based in Jackson, we travel statewide for survey work; travel is included in the quote. Every survey is quoted per building. Call (251) 308-5327.
We don’t do abatement. That’s a choice, not a rule.
Alabama does not require your asbestos inspector to be independent of your abatement contractor. AIM keeps that separation anyway: we don’t remove asbestos, we don’t bid or subcontract removal, and we don’t take referral fees from the firms that do. When we tell you a material contains asbestos, we earn nothing from that answer — and when we tell you it doesn’t, we earn nothing from that one either.
The one place federal law draws that line is schools: under AHERA, the clearance air sampling after a larger school abatement must be done by people completely independent of the abatement contractor. We think that logic belongs everywhere.
Our inspector is accredited through Alabama’s asbestos accreditation program, administered by the University of Alabama’s Safe State program — the accreditation ADEM requires for surveys of regulated structures. Samples go to an independent accredited laboratory.
Jefferson County runs its own asbestos program
ADEM runs Alabama’s air program everywhere except Jefferson County and the City of Huntsville. Here, the Jefferson County Department of Health (JCDH) enforces the asbestos rules through its Air & Radiation Protection Division. Its air rules adopt the federal asbestos standard (Section 14.2.12), so the triggers are the same as elsewhere in Alabama. The paperwork differs:
- JCDH’s own form. Notices go to JCDH on its Notification of Intention to Demolish or Renovate (form ENV-AP-146), not to ADEM.
- A review fee. JCDH’s fee schedule lists an asbestos notification review fee that must accompany NESHAP notifications.
- ADEM-certified removal. Section 14.2.12(a) requires removal projects that need notice to use parties certified by ADEM.
Mind the county line: a small part of Birmingham, and a large part of Hoover, lie in Shelby County, where ADEM is the agency. We’ll tell you where your notice goes.
Birmingham’s buildings are old enough to ask the question
According to the Census Bureau’s American Community Survey (2020–2024 five-year estimates), about 72% of housing units in the City of Birmingham were built before 1980 — roughly 78,300 of 109,300 — and about 26% before 1950. Only about 7% were built in 2010 or later. Across Jefferson County, the pre-1980 share is about 59%; statewide, about 42%.
Buildings from that era can contain asbestos in floor tile, mastic, popcorn ceilings, pipe wrap, siding and roofing. The only way to know what a material is, is to sample it.
What triggers a survey, and who files where
Every time
Federal NESHAP rules require the owner or operator to thoroughly inspect the affected facility before any demolition — whether or not anyone expects to find asbestos. Notice is due even if no asbestos is found.
Inspect first
Every renovation of a covered building needs an inspection first. Notification and work-practice rules kick in once regulated asbestos reaches 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet of material already off components whose length or area couldn’t be measured beforehand.
For a building in Jefferson County, the notice goes to JCDH, not ADEM. Every demolition, and any renovation at or above those thresholds, needs written notice at least 10 working days ahead.
Covered buildings are commercial, public, institutional and industrial buildings, plus residential buildings with five or more units. An isolated house or small building with four or fewer units is generally outside the federal rule — but not if the same owner or contractor is taking down several on one site, if it’s part of a larger commercial or public project, or if it’s burned for fire training. Worker-safety and waste-disposal rules still apply either way.
What we document
- Suspect materials, by specific location
- Homogeneous areas and how they were grouped
- Sampling rationale and chain of custody from field to laboratory
- Laboratory results, reported as received
- Materials found not to contain asbestos — a negative finding is a finding
- Condition and friability of what was found
- Bidding, performing or managing the removal
- Recommending an abatement contractor in exchange for anything
- Opinions on anyone’s medical condition or exposure history
- Calling a building “asbestos-free” on the strength of a limited survey
Birmingham, Jefferson County and beyond
We survey throughout Birmingham and Jefferson County, including Bessemer, Homewood, Mountain Brook, Irondale, Center Point, Gardendale, Fultondale and the Jefferson County side of Hoover. For North Alabama, see asbestos inspection in Huntsville; for the statewide picture, see asbestos inspection across Alabama.
Frequently asked
Who gets the asbestos notice for a project in Birmingham?
The Jefferson County Department of Health, on its own form, not ADEM. The exception is the small part of Birmingham that lies in Shelby County, where ADEM is the agency.
Does my asbestos inspector need a Jefferson County credential?
No. JCDH’s rules add no inspector credential; the state Safe State accreditation applies, and our inspector holds it. JCDH’s added rule is for removal: removal projects that need notice must use ADEM-certified parties.
Is there a fee to file with JCDH?
Yes. JCDH’s fee schedule lists an asbestos notification review fee, and its form says notifications subject to the asbestos NESHAP must be accompanied by it. Confirm the current amount with JCDH.
Does JCDH want notice for a demolition with no asbestos?
For industrial, commercial and institutional buildings, and residential buildings of more than four units, yes. JCDH’s guidance says demolition notice must be made whether or not asbestos-containing material is present.
Do I need an asbestos survey before demolishing a house in Birmingham?
An isolated house or small building with four or fewer units is generally outside the federal rule — but not if the same owner or contractor is taking down several on one site, if it’s part of a larger commercial or public project, or if it’s burned for fire training. Your contractor, lender or insurer may want a survey regardless.
How far ahead do I need to book this?
Demolitions, and renovations at or above the thresholds, need notice to JCDH at least 10 working days before work starts, and in practice that notice can’t be completed until the survey is done and you know what’s there. A survey scheduled for the week of demolition has already cost you two weeks.
Working out whether you need a survey? Describe the building and the project — we’ll tell you which rules reach it, including when the federal survey rule doesn’t apply to you. Talk to AIM or call (251) 308-5327.
This page describes federal, Alabama and Jefferson County requirements in general terms for orientation only. It is not legal advice or a substitute for the rule text or for JCDH or ADEM guidance on a specific project. Forms and fees can change; confirm them with the agency before you file. City building-permit rules are not covered here.