Before a demolition or renovation in Mobile, someone has to establish whether asbestos is present. Federal law puts that duty on the “owner or operator,” which includes the contractor running the job. We do the inspection and the sampling — and nothing after it.
Mobile is home turf. Our office is in Jackson, and Mobile and Baldwin are part of our regular service area. Every survey is quoted per building. Call (251) 308-5327.
We don’t do abatement. That’s a choice, not a rule.
Alabama does not require your asbestos inspector to be independent of your abatement contractor. AIM keeps that separation anyway: we don’t remove asbestos, we don’t bid or subcontract removal, and we don’t take referral fees from the firms that do. When we tell you a material contains asbestos, we earn nothing from that answer — and when we tell you it doesn’t, we earn nothing from that one either.
The one place federal law draws that line is schools: under AHERA, the clearance air sampling after a larger school abatement must be done by people completely independent of the abatement contractor. We think that logic belongs everywhere.
Our inspector is accredited through Alabama’s asbestos accreditation program, administered by the University of Alabama’s Safe State program — the accreditation ADEM requires for surveys of regulated structures. Samples go to an independent accredited laboratory.
Mobile’s buildings are old enough to ask the question
According to the Census Bureau’s American Community Survey (2020–2024 five-year estimates), about 61% of housing units in the City of Mobile were built before 1980 — roughly 60,200 of 98,400 — and about 13% were built before 1950. Statewide, the share is about 42%.
Buildings from that era can contain asbestos in floor tile, mastic, popcorn ceilings, pipe wrap, siding and roofing. The only way to know what a material is, is to sample it.
Mobile also has seven locally designated historic districts, where the city’s review boards must approve exterior work before it begins — a separate process that doesn’t answer the asbestos question.
Storm repair is still renovation
When Hurricane Sally made landfall at Gulf Shores on September 16, 2020, the National Hurricane Center reported widespread damage to buildings across Mobile and Baldwin counties, including significant roof and siding damage. For a covered building, repairing that damage is renovation under the federal rule. An emergency shortens the notice deadline; it doesn’t waive the rule.
What triggers a survey, and who files where
Every time
Federal NESHAP rules require the owner or operator to thoroughly inspect the affected facility before any demolition — whether or not anyone expects to find asbestos. Notice is due even if no asbestos is found.
Inspect first
Every renovation of a covered building needs an inspection first. Notification and work-practice rules kick in once regulated asbestos reaches 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet of material already off components whose length or area couldn’t be measured beforehand.
For a building in Mobile, the notice goes to ADEM, not a local agency. Every demolition, and any renovation above those thresholds, needs written notice at least 10 working days ahead. ADEM does enforce this on the coast — see the recent Orange Beach case on our Baldwin County asbestos page.
Covered buildings are commercial, public, institutional and industrial buildings, plus residential buildings with five or more units. An isolated house or small building with four or fewer units is generally outside the federal rule — but not if the same owner or contractor is taking down several on one site, if it’s part of a larger commercial or public project, or if it’s burned for fire training. Worker-safety and waste-disposal rules still apply either way.
Who we work with
- General and demolition contractors who need the survey before the notice clock starts
- Property managers and building owners — offices, retail, churches, apartment buildings
- Public and non-profit K–12 schools under AHERA
- Attorneys who need an independent, documented record
- Homeowners who want to know before someone cuts into a pre-1980 house
What we document
- Suspect materials, by specific location
- Homogeneous areas and how they were grouped
- Sampling rationale and chain of custody from field to laboratory
- Laboratory results, reported as received
- Materials found not to contain asbestos — a negative finding is a finding
- Condition and friability of what was found
- Bidding, performing or managing the removal
- Recommending an abatement contractor in exchange for anything
- Opinions on anyone’s medical condition or exposure history
- Calling a building “asbestos-free” on the strength of a limited survey
Mobile and the rest of the county
We survey throughout the City of Mobile and across Mobile County, including Prichard, Saraland, Satsuma, Chickasaw, Semmes, Dauphin Island and Bayou La Batre. For projects across the bay, see asbestos inspection in Baldwin County; for the statewide picture, see asbestos inspection across Alabama. Renovating a pre-1978 home? Ask about lead paint inspection too. For moisture or mold concerns, see mold inspection in Mobile.
Frequently asked
Who gets the asbestos notice for a project in Mobile?
ADEM. Only Jefferson County and the City of Huntsville run their own asbestos programs in Alabama, so notices for buildings in Mobile go to the Alabama Department of Environmental Management — for every demolition of a covered building, and for renovations above the thresholds.
Do I need an asbestos survey before demolishing a house in Mobile?
An isolated house or small building with four or fewer units is generally outside the federal rule — but not if the same owner or contractor is taking down several on one site, if it’s part of a larger commercial or public project, or if it’s burned for fire training. Your contractor, lender or insurer may want a survey regardless.
Does historic district approval cover asbestos?
No. In Mobile’s locally designated historic districts, the city’s review boards approve exterior work. That is a separate process from the federal asbestos rules, and an approval from one says nothing about the other.
Our building was damaged in a storm. Does the asbestos rule still apply?
Yes, for a covered building. Storm repair is still renovation under the federal rule. If the work is an emergency renovation — unplanned, caused by a sudden, unexpected event, and needed right away to prevent a safety hazard, equipment damage or an unreasonable financial burden — and it reaches the thresholds, notice is due as early as possible and no later than the following working day. Repairs scheduled once the emergency has passed need the normal 10 working days.
How far ahead do I need to book this?
Demolitions, and renovations above the thresholds, need notice to ADEM at least 10 working days before work starts, and in practice that notice can’t be completed until the survey is done and you know what’s there. A survey scheduled for the week of demolition has already cost you two weeks.
What does an asbestos survey in Mobile cost?
Every survey is quoted per building. Scope drives the number — a single-material sample and a full pre-demolition survey of a commercial property are not the same job. Describe the project and you’ll get a real figure.
Working out whether you need a survey? Describe the building and the project — we’ll tell you which rules reach it, including when the federal survey rule doesn’t apply to you. Talk to AIM or call (251) 308-5327.
This page describes federal and Alabama requirements in general terms for orientation only. It is not legal advice, and it is not a substitute for the rule text or for ADEM guidance on a specific project. Requirements turn on building type, ownership, project scope and jurisdiction; local permit rules are not covered here.