(251) 308-5327 solutions@aim-env.com

Second Opinion on a Mold, Asbestos or LDAR Quote or Report

Handed a mold, asbestos or LDAR quote or report and not sure what to believe? Send it to us. You get a plain written review of what the paperwork says and what it leaves out.

Start your second opinion

Fee confirmed in our reply before you pay anything.

Three kinds of second opinion

Mold

Estimates and lab reports

A written review within 2 business days. Flat fee. Properties in Alabama.

Asbestos

Inspection reports, lab results and removal quotes

Properties in Alabama. Timing and fee confirmed in our reply, before you pay.

LDAR

Quotes, invoices and monitoring reports

Facilities anywhere in the country. Timing and fee confirmed in our reply, before you pay.

For mold and asbestos, we do not sell the work. That is the point.

AIM does not do remediation and does not bid the work. Nothing in our review depends on what you decide to do next, so it has no reason to lean toward more work, less work or a different contractor. The same goes for asbestos: we do not remove it, we do not bid removal and we take no referral fees.

Mold: what you send

Document 1

The estimate

The remediator’s quote, proposal or scope of work. A PDF, or clear photos of every page.

Document 2

The lab report

Any air or surface sample results you already have, with every page the lab sent.

Document 3

A few photos

The areas in question, as they look now.

No lab report yet? Send what you have and tell us what worries you. We start there.

Mold: what you get

A written review of 1 to 2 pages, emailed to you within 2 business days. It covers:

  • Whether the scope of work in the estimate matches what the lab report and photos show.
  • What the estimate or the lab report leaves out.
  • What a written remediation protocol would normally spell out for a job like yours.
  • A plain English read of the lab results.

We check it against ANSI/IICRC S520, the standard we write our remediation protocols to.

Asbestos: what you send and what you get

For properties in Alabama. We read what you send and tell you what it supports.

Asbestos

What you send

  • The asbestos inspection report.
  • The lab results.
  • A removal quote or scope of work, if you have one.
  • A few photos of the areas in question.

PDFs, or clear photos of every page.

Asbestos

What we review

  • Whether the report sampled the materials in the work area, and whether the lab results support what it concludes.
  • Whether a removal quote matches what the report and lab results show.
  • What the report or the quote leaves out.
  • A plain English read of the lab results.

You get a short written review by email. We confirm the timing and the fee in our reply, before you pay anything.

LDAR: what you send and what you get

For facilities anywhere in the country. AIM also runs LDAR programs, so you should know that up front. This review covers the paperwork you send. It is not a bid for your work, and if the paperwork holds up, we say that too.

LDAR

What you send

  • The quote or proposal.
  • The invoice, if you were already billed.
  • The latest monitoring report.
  • The component count or tag list the price is based on, if you have it.

PDFs, or clear photos of every page.

LDAR

What we review

  • Whether the scope matches your program: what is monitored, how often, and the component counts the price is built on.
  • How the work is priced, such as per component, per hour or per day, and what is billed extra.
  • What the quote, invoice or report leaves out, such as repairs, repeat monitoring, data management and reporting.
  • A plain English read of a monitoring report: what it shows and what it does not.

You get a written review by email. We confirm the timing and the fee in our reply, before you pay anything. We do not certify that a program is compliant. A full check of your program against the rules is an LDAR audit, which is a separate service.

What this is, and what it is not

What it is

A document review

  • We read what you send and tell you what it supports.
  • Mold and asbestos reviews are for properties in Alabama. LDAR reviews are for facilities anywhere in the country.
What it is not

Not an inspection

  • No visit, no samples, no moisture readings. We can only speak to what you send.
  • No health opinions, and no legal or insurance advice.
  • We do not certify that a property, program or report meets a regulation.
  • No promise of an outcome. We cannot promise a contractor will change an estimate.
  • If the documents are too thin to review, we say so instead of guessing.

Need someone on site? That is an inspection: mold, asbestos or LDAR monitoring.

How it works

1

Tell us about it

Fill in the short form below with your name, your email, whether it is mold, asbestos or LDAR, and what worries you.

2

Send your documents

We reply by email with how to send your quote, report and photos, and how to pay the fee.

3

Get your review

Your written review arrives by email. For mold, that is within 2 business days of receiving your documents and payment. For asbestos and LDAR, we give you the timing in our reply.

Start your second opinion

Tell us who you are, whether it is mold, asbestos or LDAR, and what worries you. We reply by email with how to send your documents.

Second Opinion Request

Prefer email? Send your quote, estimate or report tosolutions@aim-env.com with Second opinion in the subject.

Frequently asked

Do you sell remediation or asbestos removal?

No. We never have sold remediation and we do not bid it. We do not remove asbestos or bid removal either. We assess, document and verify. That is why a mold or asbestos review has no reason to push you toward more work.

Do you review asbestos quotes and reports?

Yes, for properties in Alabama. Send the inspection report, the lab results and any removal quote. We tell you what they support and what they leave out.

Do you review LDAR quotes, invoices and monitoring reports?

Yes, for facilities anywhere in the country. Send the quote, invoice or report. We read the scope, how the work is counted and priced, and what is left out.

Do you sell LDAR monitoring?

Yes. AIM runs LDAR programs, so we say so up front. A second opinion is a review of the paperwork you send. It is not a bid for your work, and if the paperwork holds up, we say that too.

Is this the same as a mold inspection?

No. An inspection is a visit to your property with moisture readings, thermal imaging and, when the results would answer a real question, lab samples. A second opinion is a review of paperwork you already have. If the review shows a visit would help, we say so.

What if I do not have a lab report?

Send the estimate and photos. The review will say what a lab result would and would not add.

Will you tell me if the price is fair?

For mold and asbestos, we review the scope of work, meaning what the quote covers and what it leaves out. We do not put a dollar value on another company’s work. For LDAR, we also read how the work is counted and priced, and what is billed extra.

Why are mold and asbestos reviews Alabama only?

Mold assessor rules differ from state to state, so we are starting with properties in Alabama. Asbestos reviews are limited to Alabama as well. LDAR reviews are not limited to one state.

Is this legal, medical or insurance advice?

No. We are not attorneys, physicians or adjusters. It is an independent document review. If you need one of those opinions, you need a qualified professional in that field.

What does it cost?

Mold reviews are one flat fee. We confirm the fee for asbestos and LDAR reviews in our reply. Either way, you know it before you pay anything.

Related: Mold inspection in South Alabama · Post-remediation verification · Mold and water intrusion litigation support · Mold and indoor air guide · Asbestos inspection across Alabama · LDAR compliance services

AIM EH&S provides environmental review and documentation. A second opinion is a document review. It is not an inspection, and it is not legal, medical or insurance advice. ANSI/IICRC S520 is a voluntary consensus standard; references to it describe the standard we work to, not a legal requirement.